By Gaco.
When protective coatings begin to fail, even routine foot and vehicle traffic can create serious safety and maintenance challenges for property owners. That was the case at Montefiore Hutchinson Campus Medical Center, a busy Bronx medical campus where worn surfaces and water intrusion threatened daily operations and increased liability concerns. To restore reliability and improve protection across walkways and drive lanes, the facility turned to Gaco and its GacoPoly Elasto-Deck 6500 system, a high-performance waterproof traffic coating engineered for demanding environments.
The Montefiore Hutchinson Campus Medical Center, located in the Bronx, faced critical issues with its pedestrian walkways, driveways and walls, totaling 12,000 square feet. The existing 15-year-old coating system had deteriorated, leading to peeling and smooth surfaces that significantly increased the risk of slips and falls. Additionally, water infiltration was affecting the parking garage below, further compromising the safety and function of the space. With over a million vehicles passing through the driveway annually — ambulances, personal vehicles and wheelchair-accessible vans — the risks and wear on the system were growing by the day.
GacoPoly Elasto-Deck 6500 two component, aliphatic waterproof system was chosen to address the challenges. A Gaco licensed applicator, J&E Paving Waterproofing, expertly executed the project, which included:
The installation was completed in just 21 days during an ideal temperature window in the Northeast. The solution included a two-color system to clearly delineate sidewalks and driveways for vehicle and pedestrian safety.
The urban environment and high traffic volumes of the medical center demanded a durable, non-skid coating. GacoPoly Elasto-Deck 6500’s quick-curing, low VOC and low-odor properties were perfect for minimizing disruption in this busy area. Additionally, the waterproofing system protected the concrete from further water intrusion and deterioration, essential for the unpredictable Northeast climate.
By addressing slip-and-fall liabilities and water infiltration, the Elasto-Deck 6500 system improved safety and minimized maintenance costs. The fast installation timeline kept the project within budget, even with the additional security and traffic rerouting expenses. The high-performing coating ensures long-term durability, protects against wear and tear from heavy traffic flow and provides peace of mind for building owners and property managers.
This project demonstrates the reliability and efficiency of GacoPoly Elasto-Deck 6500 in high-traffic urban environments. Its combination of fast installation, affordability and safety enhancements makes it an ideal solution for medical facilities and other high-use properties. The success of this project highlights how GacoPoly products can restore and protect aging systems, leading to longer lifespans and lower maintenance costs.
From start to finish, Gaco’s team coordinated closely with the contractor and building owner to ensure the project’s success. Clear communication between all parties was key to delivering exceptional results within a tight timeline.
Original article and photo source: Gaco
Learn more about Gaco in their Coffee Shop Directory or visit www.gaco.com.
Comments
Leave a Reply
Have an account? Login to leave a comment!
Sign In