Translate
Default
English
Español
Français

User Access


IFD Become a Member -
tremco-uk--ad
Tapco Roofing Products (UK) -  Ad - Tapco Elite Roofing Awards 2026
NFRC-CutTheDust-
Who is IFD? -  Ad
RCS UK -  Ad - Launch
Coffee Conversations
Translate
Default
English
Español
Français

high rise roofing

« Back To Roofers Talk
Author
Posts
December 20, 2016 at 8:16 a.m.

prsroof

This year we are bidding three 22 story and three 27 story buildings ,three separate owners. last year we did three 12 stories and five 8-10 stories we used hydraulic swing hoists for removal and loading. We always had two men on ground with tag lines for trays or cargo nets. Elevator is out of question for four of the buildings and crane are out for three, has anyone used the hoists on the 27 story buildings your looking about three hundred feet of tag lines I have 170' cable on both hoist but I can switch out drum cable to 300'

December 21, 2016 at 11:14 a.m.

prsroof

Elevator maybe on two, all are tear offs three of the buildings are getting floor by floor gutted the freight elevator will be tide up and this is a occupy building so personal elevator are out. We done them before with the elevators and usually moving debris and materials one or two floors by hand


« Back To Roofers Talk
You must be logged in to reply to this topic.

tremco-uk-banner-ad
Translate
Default
English
Español
Français

User Access


IFD Become a Member -
Who is IFD? -  Ad
Tapco Roofing Products (UK) -  Ad - Tapco Elite Roofing Awards 2026
NFRC-CutTheDust-
tremco-uk--ad
RCS UK -  Ad - Launch