By GCP Applied Technologies.
When General Contractor Turner Construction was assigned to build the Golden 1 Center for NBA’s Sacramento Kings, they found it to be no easy task. Not only did they have to build the 17,500-seat stadium in less than two years, but they also had to find a way to waterproof it.
"GCP Applied Technologies works with contractors that perform at a very high level and was able to accept the risk due to the high performing PREPRUFE® Plus product, technical expertise and global success on similarly critical projects,” said Stuart Hunter, vice president of the Waterproofing division of F.D. Thomas, the regional waterproofing contractor. “We took the lead in making sure the general contractor, concrete subcontractor, rebar subcontractor and plumbing subcontractor all worked together to meet GCP’s requirements and deliver on the aggressive schedule."
“Unfortunately, heavy rains just weeks into the stadium construction project left the excavated jobsite under three or four feet of water,” according to Hunter. The stakes were high. The arena was being built below the water table and adjacent to two major river systems, so the stadium owner required a fail-safe below grade waterproofing solution. The Golden 1 Center had to operate dry, period. Once the skies cleared, the pressure was on F.D. Thomas to waterproof 280,000 square feet on time with no delays. F.D. Thomas held pre-job meetings to get all the trades dialed in to support a smooth, efficient installation.
To meet the requirements for operating dry, the contractors used high performance PREPRUFE® Plus waterproofing membrane. The owners especially liked the fact that more than 650 million square feet of PREPRUFE® membrane have been installed worldwide on thousands of high-profile, must-not-fail projects. As Hunter says, “It’s the industry workhorse.”
More than 96 rolls of PREPRUFE® Plus membrane (30,000 square feet) were kicked out in a single day. This allowed F.D. Thomas to shatter all expectations, finishing the stadium construction job on time and on schedule, despite the weather and project challenges.
Turner Construction officials were ecstatic with the waterproofing and the project results.
Today the stadium construction project is open to the public and no below grade leaks have been reported, in spite of historic El Niño rains and a rising water table. To that, Hunter just grins and says, “Let it rain.”
Learn more about GCP Applied Technologies in their RoofersCoffeeShop® Directory or visit gcpat.com.
Original article source: GCP Applied Technologies
We use cookies and similar technologies. Some are needed to make this site work – signing you in, keeping your session secure and remembering the choice you make here. Others are optional: they help us measure how the site is used, remember your preferences, and measure our advertising.
Optional cookies are switched off until you turn them on. You can change or withdraw your choice at any time on our cookie policy page, which is linked in the footer of every page.
Choose which categories you are happy for us to use. Nothing in an unselected category is loaded, and switching a category off deletes the cookies it has already set.
Strictly necessary
Required to deliver the site you asked for - signing in, security tokens, keeping your basket and remembering this cookie choice. These cannot be switched off.
Functionality
Remembers preferences such as your chosen language, and powers optional extras like live chat and embedded video and social posts.
Analytics
Helps us understand which pages are read and how the site is used. Data is shared with the analytics providers listed in our cookie policy.
Advertising
Used to measure advertising and sponsorship campaigns and to show you more relevant advertising on this site and elsewhere.
Comments
Leave a Reply
Have an account? Login to leave a comment!
Sign In