Skip to main content
Translate
Default
English
Español
Français

UP TO THE MINUTE

By The Coffee Shops®. The role of planning, craftsmanship and creative ...
By Tapco Roofing Products. EPD is a rigorous, third-party audited ...
Read More
IFD - Building Roofing
RCS -  Ad - Global Launch
RCS Canada -  Ad - Canada Microsite Launch
tremco-uk--ad
NFRC - - Weather the Storm
Translate
Default
English
Español
Français
Coffee Conversations
Learn More

When flat roofing projects get complicated

When flat roofing projects get complicated
November 25, 2026 at 1:00 a.m.

By The Coffee Shops®.

The role of planning, craftsmanship and creative problem-solving in building complex roofs.

For roofing contractors, some of the most valuable lessons come from projects where standard details are simply not enough. At the 2026 International Federation of Roofing Trade (IFD) Connection Forum, Senahid Kanuric, flat roof technician with Spitzer Dach, shared a residential project in Graz, Austria, that showcases this. The project involved a main flat roof, a canopy and a terrace, each bringing its own waterproofing, drainage and detailing challenges. The main roof incorporated a professional concrete substrate, bituminous vapor barrier, EPS insulation and a three-layer, root-resistant bituminous waterproofing system from Villas. A Knauf Urbanscape green roof was then installed, with the presentation noting that the greenery was completed within a single day.

As for the canopy, it posed uniquely challenging curves and a concealed recessed gutter, requiring roofing, geometry and drainage to function together. A Sarnafil system was used while drains with clamping rings provided drainage. On the terrace, crews had to coordinate varying parapet heights, door transitions, primary and emergency drainage and the necessary build-up for the finished walking surface.

Drainage presented another significant challenge. The project incorporated a 35-meter-long recessed gutter with slope, while emergency drainage was intentionally kept out of sight through drains with dam rings and covers. Custom-fabricated components were also needed to transition drainage from a 100-millimeter round configuration to a 4-centimeter rectangular profile and back to round.

Even the parapet demanded custom thinking. Different curves required crews to create wooden templates onsite to establish accurate measurements. The parapet connections used TIG welding, with bronze selected for the finished appearance.

The work ultimately earned Spitzer Dach first place in the IFD Flat Roof category in 2025. For contractors, this project showcases something we all know well — Complex roofs do not become successful because of one impressive product. They succeed when contractors understand how every component affects the next and are able to carefully coordinate between waterproofing, insulation, drainage, green roofing, sheet metal and architectural details.

Learn more about International Federation of the Roofing Trade (IFD) in their Coffee Shop Directory. 



Recommended For You


Comments

There are currently no comments here.

Leave a Reply

Commenting is only accessible to RCS users.

Have an account? Login to leave a comment!


Sign In
RCS Canada - Banner Ad - Canada Microsite Launch
Translate
Default
English
Español
Français

UP TO THE MINUTE

By The Coffee Shops®. The role of planning, craftsmanship and creative ...
By Tapco Roofing Products. EPD is a rigorous, third-party audited ...
Read More
NFRC - - Weather the Storm
tremco-uk--ad
IFD - Building Roofing
RCS -  Ad - Global Launch
Tapco -  Ad - Beauty Backed By Brains
RCS Canada -  Ad - Canada Microsite Launch